Location: Coomera Queensland
Contract Value: $1 million
Construction Period: 6 Months
Type Of Contract: Construct Only
Client: Gold Coast Water

Days Road pump station included construction of a operators building and pump station for Gold Coast Water. The operators building consisted of concrete floor, 200mm block wall construction, core filled, with timber trusses and metal roof. The pump station was finished with epoxy coating.

International Certifications FSC Accreditation | ISO 9001 | AS/NZS 4801 | ISO 14001